Project Description

Client: Toshiba International Corporation

Location: Houston, Texas

  • Developed Existing Drainage Area Map, analyzed the Existing System and Define Drainage Problems
  • Developed Proposed Drainage Area Map
  • Developed detailed Engineering Drawings for Drainage Improvements
  • Developed Specifications and quantity take-offs
  • Prepared storm water quality plans and report
  • Designed two different detention basin with pumping facilities
  • Assisted with the approvals from Harris County Flood Control District for storm water quality.

3 Key Factors/Benefits to Client:

  • Civil Design
  • Storm Water Quality Plans
  • Construction Management