Project Description

Client: Various KIT’s most recent large diameter water transmission main projects included design of 4.5 miles of 60 and 54-inch large diameter transmission pipelines along Fish Creek Thoroughfare in Montgomery County, Texas for San Jacinto River Authority as a subconsultant to Klotz Associates, Inc. KIT also designed over 2,500 linear feet of 42-inch diameter transmission line from Katy Addicks re-pump station to Church Lane and provided assistance with the design of approximately 8,300 linear feet of 42-inch diameter transmission line along Hillcroft, Dublin, Dunlap, US 90A, Haviland, Minetta, Canemont, and Sandpiper from Coach Creek to W. Airport Blvd under the City of Houston’s Surface Water Transmission Program (SWTP). As a Prime Consultant KIT recently designed approximately 2,500 LF of 30-inch water line from Southwest Pump Station for the City of Houston.