Project Description

Project: Traffic Engineering Study and Level of Service (LOS) Analysis, Memorial Drive Paving Improvements from North Kirkwood to North Eldridge, North Eldridge and Memorial Drive Intersection, and North Eldridge Widening From Memorial Drive to I-10.

Location: Houston, Texas

Client: Civiltech/City of Houston.

Tasks include traffic impact study and a level of service analysis to evaluate the existing and the proposed roadway improvements on North Eldridge at Memorial Drive.  The project study area includes the Energy Corridor requirements and their concerns for the initial proposed improvements.  Tasks also include traffic signal modifications, traffic signal field book preparation, pavement markings, Stormwater Pollution Prevention Plans, and traffic control plans. KIT performed a traffic engineering study and a level of service analysis for the AM and PM peak hour conditions to evaluate the existing roadway, traffic operations and the impacts of proposed roadway improvements along Memorial Drive between Kirkwood Drive and Eldridge Parkway.